Well thanks for the support trough this page.

But I found the following problem:

According to the instructions to use ex-coordinators we can link between more than two views (time line and two scatter plots). In my case I was trying with time line and map view and I got the coordination but...when I tried to link with one Scatter plot more the coordinators CAN NOT BE RUN.

If is posible somebody can give an idea or advice to solve this problem.

Thanks in advance.

The code is as the next:

      </td>